Limberlost Place: Post Construction Embodied Carbon Assessment
Presentation of the post-construction Life Cycle Assessment of Limberlost Place providing a unique opportunity to examine the carbon emissions of an as-built project and some insight into the ‘reality’ of the embodied carbon of a building beyond the design stage. The results allow us to validate where we are being successful in reducing carbon emissions and learn where improvements should be made.
Speakers
- Carol Cochrane, Project Manager, Moriyama Teshima Architects
- Mary O’Malley, Associate Architect, Moriyama Teshima Architects
Moderated by
- Nerys Rau, Executive Director, Facilities and Sustainability, George Brown Polytechnic
The event will take place in the 10th Floor event space.
Please enter through the East Entrance on Dockside Drive and register inside for the event.
When
Tuesday, June 2, 2026
5:30 - 8:30 PM
Where
185 Queens Quay E
10th Floor
Toronto, ON
M5A 0A4
Cost $10
Host CLF Toronto & Toronto Climate Week